top of page

Cost Reduction Opportunity Assessment: What Manufacturers Should Get

Writer: Mike Johnstone
Mike Johnstone
Nov 5
6 min read

Updated: Nov 13

A cost reduction opportunity assessment is worth buying only if it ends in a ranked list of savings. Each line carries a dollar size and a named owner, plus a counting method your finance team agreed to before the work started. Anything less is a report, and reports do not move an income statement.


You can hire someone to look at your costs tomorrow. The harder part is knowing what you should be holding when they finish. I have spent more than 25 years in procurement, and I have read plenty of assessment decks that describe a plant in careful detail and then stop. Nothing in them tells the plant manager what to do on Monday. Nothing tells the CFO which number to expect in the quarter.


This post covers what a good assessment contains, how it differs from an audit or a lean review, and what to ask before you sign anything.


What a cost reduction opportunity assessment is


An assessment is a short, scoped look at where money leaves your business and which exits you can close. It ranks opportunities. It does not execute them.


Scope matters here. At a mid-size manufacturer, most of the savings list comes from what you buy. Purchased material, freight, payment terms and indirect spend add up to the largest block of controllable cost, and they sit in data you already own. An assessment that spends its budget on org charts and mission statements has missed the point.


Think of the output as a decision tool. It tells you which opportunities to chase first and which to leave alone. The chasing is separate work with its own owner and its own timeline.


Assessment, audit, or lean review: which one you need


These three get mixed up in sales calls, and each answers a different question.


  • A cost reduction opportunity assessment asks where the money is. It ranks savings across your spend.

  • A procurement audit asks how your buying process works. It examines approvals, supplier selection, contract terms and controls. I wrote up how that runs in how a procurement audit works.

  • A lean review asks where the shop floor wastes time and material. It looks at flow, changeovers, scrap and rework.


Pick the assessment when you suspect money is leaking but cannot say where. Pick the audit when savings keep getting found and then lost, because that points to a process problem. Pick the lean review when your biggest costs sit in scrap, downtime and rework.


Buyers get into trouble when they purchase one and expect the output of another. An audit will not hand you a ranked savings list. A lean review will not renegotiate a single contract.


Where the opportunities sit at a manufacturer


Four areas hold most of the money at a plant in the $50M to $500M range.


  • Purchased material: price, specifications, supplier count and the contract terms on the parts you buy most.

  • Freight and expedites: premium shipping paid because a purchase order went out late or a supplier shipped short.

  • Payment terms: cash tied up because nobody renegotiated terms after your volume grew.

  • Indirect spend: maintenance supplies, packaging, services, software and the long tail of vendors nobody owns.


Shop-floor waste is real money too. It needs a lean review, though, and a good assessment treats it as a pointer. The assessor flags where the floor looks expensive, names who should look at it, and moves on. An assessment that tries to be a second how-to guide on scrap reduction loses focus on the spend you can actually rank.


Look at the order of operations as well. Spend data comes first. Your ERP export already shows what you buy, from whom, at what price and on what terms. A competent assessor can rank most of the list from that export before anyone walks the plant.


What a good assessment hands you


You should leave with a document you can act on in the next meeting. It has five parts.


  1. A ranked list, biggest opportunity first.

  2. A dollar size on each line, stated as an annual figure.

  3. A confidence level on each line, with the one thing the number depends on.

  4. A named owner on your side for each line, a person and not a department.

  5. A written counting method that finance has agreed to, covering the baseline, the volume and the period.


The last part is the one buyers skip. Without it, procurement reports one number and finance recognizes another.


Here is what a single line looks like. The numbers below are invented to show the format. They are not a client result.


Re-bid the three highest-volume resin grades. Size: $240,000 a year. Confidence: medium, because it depends on two suppliers quoting. Owner: the plastics buyer. Finance method: new price times the last twelve months of volume, measured against the old price on the invoice.

A line like that gets funded or killed in one meeting. A line that reads "review resin contracts" disappears into a committee and never comes back.


Weak assessments share a few tells. The findings read as observations, such as "the supplier base is fragmented" or "payment terms vary." Both statements are true and neither tells you what to do. The savings show up as a percentage of total spend with no line detail behind them. The report names a category but never a person. The author cannot say which data produced which number. Any one of those is a reason to push back before you pay the final invoice.


The inputs should be modest. Expect to hand over twelve months of purchase order and invoice history, your supplier master and the current contract terms for your top vendors. If an assessor asks for far more than that before showing you anything, the scope has drifted.


Questions to ask before you hire someone


Ask these before you sign. Weak answers tell you what the engagement will look like.


  1. What will I hold at the end, and can I see a sample with the client name removed?

  2. How do you size each opportunity, and what data do you need from my team?

  3. Who owns each line once you leave?

  4. How does my finance team count a saving, and who signs off on that method?

  5. What do you do with opportunities you cannot size?

  6. Do you get paid on savings found, and does that change what you recommend?


Question four does the most work. A consultant who has no answer has never had a number challenged by a controller. Question six matters because pay tied to savings found pushes an assessor toward the quick, visible wins and away from the slower ones with larger dollars attached.


How savings get lost after the assessment


A good list still fails if the savings never reach the income statement. GEP, the procurement software and consulting firm, names the core problem in its paper on getting procurement savings to the bottom line: a disconnect between the savings procurement reports and the results finance recognizes. GEP traces that gap to inconsistent definitions of what counts as a saving and to weak baselines, then adds limited tracking once the contract is signed.


I have watched this happen at plants that did everything else right. Procurement closes a contract at a lower unit price. Volume drops, the product mix shifts, and the finance team sees no change in the cost line. Both sides are correct. They counted different things.


The fix starts before the assessment does. Agree on the definition of a saving, the baseline and the review period in writing. Then every line in the report carries that definition forward. I covered the finance side of this in why procurement savings keep disappearing in the P&L, and it applies to any assessment you commission.


Ownership is the second place savings leak. A line with no named owner on your side has no one to chase it after the consultant leaves. Check the owner column before you accept the report.


When to bring in outside help


Run the assessment yourself if your spend data is clean, someone on your team owns it and that person has the time. Bring in help when nobody has the hours to rank the list, or when finance will not accept procurement's numbers and you need a neutral party to set the counting method.


Flambeau Consulting helps mid-size manufacturers find and rank cost reduction opportunities in what they buy, and hands finance a list it can sign. Start with a free 30-minute call and your last ERP spend export, or see how engagements usually run on the Flambeau Consulting services page.


The result you want is plain. A short list, dollar sizes you trust, a name beside every line and a method finance has already approved. If an assessment cannot promise that, keep your money.


Ready to see what an assessment of your spend would find? Book a Free 30-Minute Call and bring your last ERP spend export.

Is this a problem in your plant right now?

I work with mid-size manufacturers to cut costs, improve cash flow, and reduce supply chain risk, backed by the Quick Wins Sprint guarantee: documented savings larger than the Sprint fee within six months, or you pay nothing.

 

Book a free 30-minute call and I will tell you exactly where to start.

bottom of page